Project: | Rehabilitation of water supply and sanitation in Isoka Town, Muchinga Province, Zambia |
Scope of Work: | ![]() |
Client & Country: | Name of Client: Chambeshi Water and Sewerage Company |
Contract Value: | $ 496,078.00 |
Completion Date: | 2015 |
Project: | Consultancy Services for Supervision of Borehole Siting, Drilling and Installation of 286 Hand pumps in Chienge, Nchelenge, Kawambwa, & Mwense Districts of Luapula Province; and Mbala, Kaputa, Mporokoso, Luwingu, Chilubi & Mungwi Districts of Northern Province, Lot 4 Chavuma and Zambezi Districts in Northwestern, Lot 4 |
Scope of Work: | ![]() |
Client & Country: | Name of Client:UNICEF (United Nations Children’s Fund)
Contact Person: Humble Siboli WASH Officer |
Contract Value: | $ 321,272.54 |
Completion Date: | 2014 |
Project: | Consultancy Services for Review of Borehole Siting; And Supervision of Drilling and Installation of 80 Hand pumps in Luangwa district of Lusaka Province |
Scope of Work: | ![]() |
Client & Country: | Name of Client:Ministry of Local Government and Housing (MLGH), Government of Republic of Zambia,
Contact Person: Peter Lubambo, Former Director, DHID Ridgeway, Lusaka, P.O. Box 50027, Lusaka, Zambia. |
Contract Value: | $ 133,000.00 |
Completion Date: | 2011 |
Project: | Topographical & Geological Survey for the Preparatory Survey on the Project for Groundwater Development in Luapula Province Phase 3 in the Republic of Zambia |
Scope of Work: |
WRC Preformed the following tasks: Standard Penetration Test (SPT) to depth of 10m at five sites, preparing of the boring logs and profiles of penetration resistance (N), Elevation surveys from water source to elevated water tank and public faucets for surveying and distance, centerline survey (30km) for the pipeline,Topographic survey for facilities and important features and preparing key plan (topographic map). Preparation of report on electronic files and hard copies. |
Client & Country: | Name of Client:Japan Techno Co., Ltd Contact Person: Tetsuo Yabe, Chief Consultant Saori Iwamoto, Social Conditions Survey/ Operation and Maintenance Planning Officer |
Contract Value: | $ 64,550.00 |
Completion Date: | September 2013 |
Project: | Geophysical Borehole Electrical Logging under the Project for Drilling of Ten (10) Test Boreholes for Groundwater Development in Luapula Province – Phase 3 in the Republic of Zambia |
Scope of Work: |
Zambezi Drilling sub-contracted WRC to perform geophysical electrical logging on the 10 boreholes as a component of the project. WRC Consultants Ltd carried out geophysical electrical logging of successful production boreholes. Parameters measured and presented as logs were Self-potential, Natural gamma, Long and Short resistivity and neutron-neutron. |
Client & Country: | Name of Client:Japan Techno Co., Ltd Contact Person: Tetsuo Yabe, Chief Consultant Saori Iwamoto, Social Conditions Survey/ Operation and Maintenance Planning Office |
Contract Value: | $ 23,000.00 |
Completion Date: | September 2013 |
Project: | Consultancy Services for Siting of Boreholes and Supervision of Superstructure Construction and Handpump Installation in1) Mongu, Senanga, Lukulu East and Kaoma Districts, Western Province, Zambia, Lot 2, and 2) Sesheke East District (Western Province), Kalomo and Namwala Districts (Southern Province), Zambia, Lot 3 |
Scope of Work: | ![]() |
Client & Country: | Client: Ministry of Local Government and Housing (MLGH), Government of Republic of Zambia, 15101 Ridgeway, Lusaka, P.O. Box 50027, Lusaka, Zambia.
Contact Person: Peter Lubambo, Director, DHID |
Contract Value: | Lot 2 = $855,000 Lot 3 = $595,000 Total = $1.45m |
Completion Date: | 2011 |
Project: | Consulting Services for Water Quality Analysis and Monitoring through Hand pump Replacement to Propose Standardized Specifications of Hand pump Water Supply Facilities with Considering Water Quality Under the Project for Support in National Roll-Out of Sustainable Operation and Maintenance Programme (SOMAP3) |
Scope of Work: |
WRC was awarded the contract by Japan Techno., Ltd to conduct Consulting Services for Water Quality Analysis and Monitoring. The main aim of the water quality analysis and monitoring study was to assess relationship between water quality with high iron content and steel made downhole components of the hand pumps and whether utilization of PVC pipes and stainless steel connecting rods avoids the increment of iron content in the groundwater in boreholes. |
Client & Country: | Name of Client:Japan Techno Co., Ltd
Contact Person: Mr Naoki Mori, Chief Advisor, SOMAP3 Email: This email address is being protected from spambots. You need JavaScript enabled to view it.
, |
Contract Value: | $ 159, 800.00 |
Completion Date: | April 2013 |
Project: | Consulting Services for the Baseline Survey for Determination of Indicators for Programme Objective under the Project for Support in National Roll-out of Sustainable operation and Maintenance Programme (SOMAP3) in the Republic of Zambia. |
Scope of Work: |
The Baseline Survey was conducted on 300 water points in 10 districts (Kazungula, Chongwe, Serenje, Lundazi, Sesheke, Mufumbwe, Luwingu, Mansa, Nchelenge and Chinsali) through semi-structured interviews with District Local Authorities (DLA’s), structured interviews with questionnaire with V-WASHE as the target group and direct observations and measurement of the conditions of wells with hand pumps. The overall objective was to obtain the following baseline data: Operational rate of wells equipped with hand pump, downtime of the wells with hand pumps, and percentage of rural population with access to safe, reliable and convenient quantity of water. |
Client & Country: | Client: Japan Techno Co., Ltd
Contact Person: Mr Naoki Mori, |
Contract Value: | $ 210,000.00 |
Completion Date: | April 2012 |
Project: | Geophysical Siting and Borehole Siting Report for the Development of Kabitaka Township and Kansanshi Mine Well fields, Zambia |
Scope of Work: |
WRC was commissioned to implement a borehole siting programme with the prime aim of exploring and developing groundwater resources to meet the projected future water supply demand for the Kabitaka township. Ground geophysical surveys were undertaken to locate at least twenty potential drilling sites in a new well field to develop 10 successful boreholes to meet the projected demand.WRC were commissioned to conduct a further geophysical investigation with the prime aim of exploring and developing a new well field to meet the mine’s long-term potable water supply requirements. The overall goal of the project was to survey and site locations for drilling 10 pilot boreholes from which a well field will be developed. The survey consisted of Magnetic, Resistivity and Horizontal Loop Electromagnetic (HLEM) profiling followed by Vertical Electrical Soundings (VES). A total of 50km of Magnetic profiling, 13km of Resistivity profiling, 42km of HLEM profiling, and 114 VES were completed. Analysis of the survey results in the context of the hydrogeological understanding of the area provided the partial selection of 10 sites for drilling new boreholes. |
Client & Country: | Kansanshi Mining PLC, Old DR Congo Road P. O Box 110385, Solwezi Zambia
Contact Person: Victor Masedi |
Contract Value: | $ 128,600 |
Completion Date: | 2012 |